Complete Solutions to Your Environmental Concerns
Site Remediation

Boarhead Farms Superfund Site (Buried Drum Removal)

Removed and handled 600+ buried drums containing chemical unknowns and acutely toxic materials (Levels A and B PPE).    Performed remedial excavation during record-setting rainfall (43+ inches).  Designed and installed dewatering system for the collection, on-site treatment, and permitted discharge of more than 750,000 gallons of construction water.